Alpes Suisses, 2125

YOUR MISSION

Restore stable energy production before the systems collapse. You only have 10 turns. Reach stable energy production before turn 10 and successfully deploy at least one geothermal installation.

WATCH YOUR RESOURCES
Energy: If Energy drops below 35%, the bunker enters critical failure.

Materials: Construction consumes materials quickly. Recycle infrastructure if reserves become too low.

Personnel: Your engineering team is limited. Too many losses will end the mission.

Stability: Solar and wind are fast but unstable. Geothermal systems improve long-term resilience.

EXPECT RANDOM EVENTS
Ash storms, module failures, no wind periods, seismic activity and drilling incidents can disrupt your systems at any time.

IN DOUBT?
Use the CALL EXPERT button for technical information before making strategic decisions.

WHERE WILL YOU DEPLOY YOUR TEAM?

1/10 TURNS
ENERGY: 45%
MATERIALS: 100%
PERSONNEL: 20
Selected zone landscape

MISSION COMPLETE